Malaysia Offshore Oil Platform Protection

2026-04-02

Offshore Oil Platform Protection, Malaysia

Location : Malaysia
Asset : Offshore oil platform
Year : 2007
Application : Primary containment and abrasion protection
Scope : Protection for upper decks and internal structures
Coating System : ST coating, 1 mm thickness
Coated Area : 440 m²

Key Challenges

  • Extremely tight construction schedule with only a few days allowed for recoating.
  • Slow-curing products could not be used due to limited turnaround time.
  • Closed and confined working spaces requiring low or zero VOC materials for safety.
  • Heavy offshore exposure demanding strong abrasion and mechanical resistance.

Solutions & Execution

  • Substrates were blast cleaned to a surface profile of 50–80 microns in accordance with industry standards.
  • ST coating was applied at a thickness of 1 mm across all treated areas.
  • Featuring rapid curing and excellent physical performance, ST perfectly fit the compressed timeline.
  • Zero VOC formulation ensured safe application inside confined offshore compartments.
  • The lining was ready for inspection and testing within 3 hours, and the assets were fully returned to service within 4 hours.

latest company case about Malaysia Offshore Oil Platform Protection

latest company case about Malaysia Offshore Oil Platform Protection

latest company case about Malaysia Offshore Oil Platform Protection

latest company case about Malaysia Offshore Oil Platform Protection