Beijing Portable DN1600 Concrete Pipeline Rehabilitation

2026-04-02

Beijing Portable DN1600 Concrete Pipeline Rehabilitation

Location: Shunyi District, Beijing, China

Asset: DN1600 reinforced concrete pipeline

Key Project Parameters & Critical Challenges

  • Compact Manhole & Large Diameter Constraint: Extra-small manhole design with a 680mm diameter opening, far smaller than standard manhole specifications, posing strict access limitations for large-diameter pipeline repairs
  • Deep Burial Condition: Pipeline buried at a depth exceeding 5 meters, increasing construction difficulty and operational safety requirements
  • Urgent Project Timeline: Tight emergency delivery schedule requiring accelerated construction and prompt response
  • Last-Minute Process Adjustment: Unplanned temporary modification to the rehabilitation technique to adapt to site constraints and meet emergency delivery targets