Beijing High-Temperature & High-Pressure Gas DN1200 Metal Pipeline Rehabilitation

2026-04-02
DN1200 Metal High-Temperature & High-Pressure Gas Pipeline Rehabilitation

Location: Qinghe Reclaimed Water Plant, Beijing, China

Asset: DN1200 metallic pipeline

Key Project Parameters & Critical Challenges
  • High-temperature, high-pressure corrosive gas transmission pipeline
  • Operating pressure: 0.8 MPa continuous working pressure
  • Long-term transport of corrosive gas at temperatures above 95°C
  • Severe internal wall corrosion and perforations, causing heavy gas leakage
  • Demands high-temperature & corrosion-resistant repair solutions to restore structural integrity and airtightness